Gray Army Air Field, Fort Lewis/Tacoma, Washington, United States
Plan a trip involving Gray Army Air Field (KGRF) with airport location, runway references and nearby empty-leg listings. The direct carrier must confirm airport access and aircraft suitability for your itinerary.
KGRF - Gray Army Air Field, Fort Lewis/Tacoma, Washington, United States
ICAO Code: KGRF · IATA Code: GRF
Identifier references: OurAirports · FAA NASR (September 3, 2026).
View on Google Maps →Current Empty Legs Within 250 Miles of KGRF
Unable to load current listings
Airport Classification
Medium airport
Scheduled passenger service is not listed in the source; this does not determine charter access.
Longest Published Runway
6,124 ft
Reference length only; usable runway and aircraft performance must be confirmed for the mission.
Field Elevation
300 ft
Published reference elevation; verify current airport and performance information before departure.
FBO, Handling & Access
Confirm for this mission
Current suitability, handling, parking, fuel, and permissions require direct-carrier confirmation.
Gray Army Air Field (KGRF) Private Jet Charter Planning
OurAirports identifies Gray Army Air Field (KGRF) as a medium airport in Fort Lewis/Tacoma, Washington, United States, serving the Fort Lewis/Tacoma area. Its source identifiers are GRF, KGRF. The source does not mark scheduled passenger service, which does not determine private-charter access.
Runway and operating checks for KGRF
For preliminary comparison, the same source lists a longest published runway of 6,124 feet and a field elevation of 300 feet. Those values are reference fields, not an operating approval. Before a trip is proposed, the direct air carrier must confirm airport status and access, usable runway length and surface, aircraft performance, payload, weather, current notices, parking, fuel, customs when applicable, and handling for the requested date.
What to include in a charter request involving KGRF
For a useful review, provide the passenger count, baggage, pets, accessibility needs, preferred schedule, and exact ground destination. Jet Partners acts as an air charter broker and does not operate aircraft; a licensed direct air carrier controls and operates the flight. Aircraft, airport suitability, availability, operator, payment, change, and cancellation terms are confirmed in writing for the specific trip.
Reference coordinates, classification, elevation, and published runway length shown on this page come from OurAirports open data for source ident KGRF. Reference fields can change and do not confirm airport status, charter access, or operator acceptance.
Planning references: the FAA Chart Supplement search and NOTAM Search. These are research starting points, not confirmation that KGRF accepts charter operations. Current access and mission suitability require direct-carrier confirmation.
Nearby airport reference comparison
| Airport | Distance from KGRF | Published runway |
|---|---|---|
| Gray Army Air Field (KGRF)OurAirports record for KGRF | This airport | 6,124 ft |
| McChord Air Force Base (KTCM)OurAirports record for KTCM | 6.4 mi | 10,108 ft |
| Gower Field (6WA2)OurAirports record for 6WA2 | 11.5 mi | 5,000 ft |
| Tacoma Narrows Airport (KTIW)OurAirports record for KTIW | 13.0 mi | 5,002 ft |
Distances are between airport coordinates, not driving distances or flight routes. Runway figures are source references, not usable landing distances. View the KGRF source record or read the methodology and download airport reference data.
Cite this airport guide
For a destination guide, trip brief or article, reference this stable page and the underlying source. Include the date you accessed it.
Jet Partners. Gray Army Air Field (KGRF) airport planning reference. https://jetpartners.aero/airports/GRF#airport-reference. Reference data: OurAirports. Add your access date when citing.
Permanent link to this referencePlan a Private Jet Trip Involving KGRF
Request a trip-specific review involving Gray Army Air Field. Airport access, aircraft, operator, availability, payment, change, and cancellation terms are confirmed in writing for the mission.